This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
chara:operating_procedures [2018/07/03 17:07] jones |
chara:operating_procedures [2018/07/03 17:09] jones |
||
---|---|---|---|
Line 4: | Line 4: | ||
[[chara: | [[chara: | ||
[[chara: | [[chara: | ||
- | [[/ | + | [[chara: |
- | [[/ | + | [[chara: |
- | [[/ | + | [[chara: |
[[/ | [[/ | ||
[[/ | [[/ | ||
Line 248: | Line 248: | ||
* Metrology Laser and Metrology Monitor | * Metrology Laser and Metrology Monitor | ||
* Pico 2 | * Pico 2 | ||
- | \\ 3.10 See the instruments page for information about starting different instruments at the beginning of the night:\\ [[/ | + | \\ 3.10 See the instruments page for information about starting different instruments at the beginning of the night:\\ [[/ |
+ | ====OBSERVING CONDITIONS==== | ||
+ | \\ \\ [[http:// | ||
* Monitor the progress of opening the domes by turning the televisions [ON] using the telescope GUIs. Click [SPY1] to view the dome slit. | * Monitor the progress of opening the domes by turning the televisions [ON] using the telescope GUIs. Click [SPY1] to view the dome slit. |