2.3.4 Checking the alignment to the rail target | 2.3.4 Checking the alignment to the rail target | ||
- | Put the rail target onto delay lines (toward back of the room from home sensor) Make sure carts are at back of the rails. Check spot on back side of target. If alignment is bad at the back, follow instructions for BRT adjustments. (Printed sheet on metrology table) | + | Put the rail target onto delay lines (toward back of the room from home sensor) Make sure carts are at back of the rails. Check spot on back side of target. If alignment is bad at the back, follow instructions for BRT adjustments. (Printed sheet on metrology table) Remove rail target and return it to the spare table when done. |
2.3.5 IR alignments are below in 2.4\\ | 2.3.5 IR alignments are below in 2.4\\ | ||
Line 111: | Line 111: | ||
2.3.6 M10 Alignment | 2.3.6 M10 Alignment | ||
- | Go to a computer anywhere to check the beam remotely at the telescopes. Check Vacuum Monitor that the vacuum is below 20 torr. Open telescope gui from pull down menu. Click TV [ON] to open the camera window and click [M10AL] to change view to the M10 alignment view, click [M7 open] to open the M7 mirror cover. Center bright spot in beam on the black reference spot. You may need to adjust the IRIS or the TV brightness to see the bright spot well. [BEAM] cycles the iris from open to closed and gives a good idea of where the center of the spot is. To adjust the position, use Pico 2 to select, for example, E2M10 → [MOVE] (use large steps ~ 100) * Note that the up, down, left, and right buttons do no correspond to the actual directions the spot will move. When the spot is centered, click [M7 close] to close the mirror cover * click TV [OFF] to close the window | + | Go to a computer anywhere to check the beam remotely at the telescopes. Check Vacuum Monitor that the vacuum is below 20 torr. Open telescope gui from pull down menu. Click TV [ON] to open the camera window and click [M10AL] to change view to the M10 alignment view, click [M7 open] to open the M7 mirror cover. Center bright spot in beam on the black reference spot. You may need to adjust the IRIS or the TV brightness to see the bright spot well. [BEAM] cycles the iris from open to closed and gives a good idea of where the center of the spot is. To adjust the position, use Pico 2 to select, for example, E2M10 → [MOVE] (use large steps ~ 100). |
\\ | \\ | ||
Line 128: | Line 128: | ||
For CLIMB 1 and CLIMB 2, the removable 6-beam target should be placed in the clamps on the CLIMB table. This also applies to aligning CLIMB for fringe tracking for VEGA or fringe finding for PAVO.\\ | For CLIMB 1 and CLIMB 2, the removable 6-beam target should be placed in the clamps on the CLIMB table. This also applies to aligning CLIMB for fringe tracking for VEGA or fringe finding for PAVO.\\ | ||
\\ | \\ | ||
- | For MIRCX, the same target should be placed in the clamps on the MIRCX table. | + | For MIRCX, the same target should be placed in the clamps on the MIRCX table. |
2.5 Starting up OPLE and Metrology | 2.5 Starting up OPLE and Metrology | ||
Line 136: | Line 136: | ||
Check delay line wires on carts, make sure nothing is on tracks\\ | Check delay line wires on carts, make sure nothing is on tracks\\ | ||
\\ | \\ | ||
- | On the Metrology table inside the lab * Turn on two blue amplifiers for metrology laser (on button is labeled " | + | On the Metrology table inside the lab, turn on two blue amplifiers for metrology laser (on button is labeled " |
2.6 Final steps in the lab | 2.6 Final steps in the lab | ||
Line 159: | Line 159: | ||
3.3 Servers required for observing | 3.3 Servers required for observing | ||
- | Servers can be opened from the pop up menu at bottom of screen 1, using the black platter icon or using the Observation Setup icon which opens them all at once. * The GPS server and the METROL server should always stay on and remain on screen 1 Close and re-open all Telescope servers after UT 0h in screen 2 (because of tiptilt connection issues). Open Primary OPLE Server and gui, Open Classic, Climb1, or Climb2 if needed, Open Tiptilt Server, Open Metrology Monitor (METROL) gui, (upper right of screen | + | Servers can be opened from the pop up menu at bottom of screen 1, using the black platter icon or using the Observation Setup icon which opens them all at once. The GPS server and the METROL server should always stay on and remain on screen 1 Close and re-open all Telescope servers after UT 0h, (because of tiptilt connection issues) |
- | 3.4 Open Telescope guis, o(bsgtks) | + | 3.4 Open Telescope guis, or obsgtks |
- | 3.5 Open GUIs required for observing from the menu under GTK: Open Primary OPLE gui (move to right side of OPLE server) * Open Classic, Climb1, or Climb2 gui if needed | + | 3.5 Open GUIs required for observing from the menu under GTK or the desktop icons: Open Primary OPLE gui, Open Classic, Climb1, or Climb2 gui if needed, Open LDC1 and LDC2 if VEGA or PAVO programs are observing. |
3.6 Using the Cosmic Debris job sequencer | 3.6 Using the Cosmic Debris job sequencer | ||
- | \\ | + | Open Cosmic Debris, CD for short, from the desktop icon. |
- | Open Cosmic Debris, CD for short, | + | Set the instrument and settings on Cosmic Debris. |
- | Set the instrument and settings on Cosmic Debris | + | Establish connection between tiptilt and the telescopes. |
- | Establish connection between tiptilt and the telescopes. | + | Finish setting up tiptilt GUIs * Click re-open on the Tiptilt GUI. This will update the TT labels on the TT viewing screens from B1,B2,etc to the telescope names. |
- | Finish setting up tiptilt GUIs * Click re-open on the Tiptilt GUI. This will update the TT labels on the TT viewing screens from B1,B2,etc to the telescope names * Click on the [SERVO CONTROL] tab on the tiptilt GUI to bring up a second window and move to screen 5 with the telescope guis. * The Servo Control GUI allows you to turn ON the servo for the TT loop and make biases for individual beams (DBIAS and ZBIAS) | + | |
- | Turning on the metrology laser * Make sure that no one is in the lab. * Turn the Laser on using the metrology laser GUI. The [Laser Power] button will go from red to green. | + | 3.7 Turn on metrology laser and home the carts |
- | Home each of the active carts * The carts must be homed before observing or else fringes will not be found. Do not forget this step or endless frustration will follow. | + | |
+ | Make sure that no one is in the lab. Turn the Laser on using the metrology laser GUI. The [Laser Power] button will go from red to green. | ||
+ | Home each of the active carts. | ||
+ | |||
+ | 3.8 Synchronizing the clocks | ||
+ | |||
+ | Synchronizing the clocks is very important for positional calculations of the telescopes and ople carts. | ||
+ | |||
+ | 3.9 | ||
+ | |||
+ | The following windows should be opened on computer screen | ||
+ | |||
+ | 3.10 | ||
+ | |||
+ | See the instruments page for information about starting different instruments at the beginning of the night:\\ | ||
[[: | [[: | ||
\\ | \\ |