User Tools

Site Tools


chara:operating_procedures

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
chara:operating_procedures [2020/01/23 14:26]
jones
chara:operating_procedures [2020/01/23 14:28]
jones
Line 151: Line 151:
 \\ \\
 **Chapter 3: ** **Chapter 3: **
 +=== Setting up Computer in the Control Room ===
  
 17 DEC 2019 by Norm 17 DEC 2019 by Norm
  
-Setting up Computer in the Control Room 
  
 3.1 General Overview of Control Room computer setup 3.1 General Overview of Control Room computer setup
Line 200: Line 200:
 \\ \\
 \\ \\
-**Chapter 4: **Observing Conditions+**Chapter 4: ** 
 +=== Observing Conditions ===
  
 \\ \\
Line 249: Line 250:
 \\ \\
 \\ \\
-**Chapter 5:** Going on Sky+**Chapter 5:**  
 +=== Going on Sky ===
  
 5.1 Opening the Telescope Domes and enclosures\\ 5.1 Opening the Telescope Domes and enclosures\\
Line 288: Line 290:
 [[:chara:operating_procedures|Back to Main Menu]]\\ [[:chara:operating_procedures|Back to Main Menu]]\\
 \\ \\
-**Chapter 6:** === = Procedure for Shutting Down at the End of the Night+**Chapter 6:**  
 +=== Procedure for Shutting Down at the End of the Night ===
  
 6.1 End Night Sequence Introduction\\ 6.1 End Night Sequence Introduction\\
chara/operating_procedures.txt · Last modified: 2023/09/01 02:50 by gail_stargazer