User Tools

Site Tools


chara:operating_procedures

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
chara:operating_procedures [2020/02/04 18:28]
charaobs
chara:operating_procedures [2021/10/13 17:01]
farringt0n
Line 14: Line 14:
 __**SUPPLEMENTAL INFORMATION**__ \\ __**SUPPLEMENTAL INFORMATION**__ \\
 [[:chara:remote_observing|Remote Observing]]\\ [[:chara:remote_observing|Remote Observing]]\\
-[[:chara:power_outage|Power Outage]]\\+[[:chara:power_outage|Shutting Down prior to a Power Outage]]\\ 
 +[[:chara:power_recovery|Recovering from a Power Outage]]\\
 [[:chara:trouble_shooting|Trouble Shooting]]\\ [[:chara:trouble_shooting|Trouble Shooting]]\\
 [[:chara:text_commands_for_chara_guis|Text Commands for CHARA GUIs]]\\ [[:chara:text_commands_for_chara_guis|Text Commands for CHARA GUIs]]\\
Line 23: Line 24:
 [[https://docs.google.com/document/d/1b1f0pgeeKOx5NO-jUOCbFM-e7b9GL8iBMFijD1B3Qc8/edit#|Telescope AO User Manual]]\\ [[https://docs.google.com/document/d/1b1f0pgeeKOx5NO-jUOCbFM-e7b9GL8iBMFijD1B3Qc8/edit#|Telescope AO User Manual]]\\
 [[https://docs.google.com/document/d/1TnLxWaAw42DZwh7l6_wPfe_CpIfT935_aShK0ymBX1o|WFS TT Alignment and Usage]]\\ [[https://docs.google.com/document/d/1TnLxWaAw42DZwh7l6_wPfe_CpIfT935_aShK0ymBX1o|WFS TT Alignment and Usage]]\\
-[[https://docs.google.com/document/d/1UY5C8Pkbi_yd448aF_TXXE9KFkwjd5VK3LALvkFahjQ/|Coude alignment (daytime)]]\\ +{{:chara:files:tiptilt_splitters_change.pdf|Tip-tilt Splitters Change}} \\ 
-{{:chara:files:tiptilt_splitters_change.pdf|Tip-tilt Splitters Change}}+{{:chara:files:beaconrecoveryinstructions.pdf|E2 AOB Dichroic Recovery Document}} \\ 
 +{{:chara:files:e1_hut_coms_recovery.pdf|E1 HuT and Cooler Communications Recovery}}
  
-[[:chara:azimuth_coude_alignments|Azimuth coudé alignments]]\\+{{:chara:files:twfs_faint_objects.pdf|TWFS Faint Object Instructions}} \\ 
 +[[:chara:coude_alignment_procedure|Coude alignment procedure]] - Updated 2021Jun01\\
 [[:chara:horizons|Telescope Horizon Limits]]\\ [[:chara:horizons|Telescope Horizon Limits]]\\
 [[:chara:restarting_servers|Restarting Servers]]\\ [[:chara:restarting_servers|Restarting Servers]]\\
Line 33: Line 36:
 [[:chara:instruments|Observing Logs]]\\ [[:chara:instruments|Observing Logs]]\\
 [[:chara:fringe_offsets|Recent fringe offsets]]\\ [[:chara:fringe_offsets|Recent fringe offsets]]\\
 +[[:chara:glass_offsets|Recent glass offsets]]\\
 [[:chara:instruments|Software setup for specific instruments]]\\ [[:chara:instruments|Software setup for specific instruments]]\\
-[[:chara:classic_faint_object_procedures|Classic Faint Object Procedures]]\\+[[:chara:classic_faint_object_procedures|Classic Faint Object Procedures]] 
 + 
 +\\
 \\ \\
 __**DOCUMENTATION TO BE UPDATED**__ \\ __**DOCUMENTATION TO BE UPDATED**__ \\
Line 40: Line 46:
 \\ \\
 CHARA Array Operating Procedures\\ CHARA Array Operating Procedures\\
-Copyright © 2005-2020 The CHARA Team\\ +Copyright © 2005-2021 The CHARA Team\\ 
-Last updated: 2020-1-22\\+Last updated: 2021-08-10\\
 \\ \\
 \\ \\
Line 79: Line 85:
 === Preparations in the Lab Prior to Observing === === Preparations in the Lab Prior to Observing ===
  
-27 AUG 2012 by Judit, Current version 17 JAN 2020 by Norm+27 AUG 2012 by Judit, Current version 10 Aug 2021 by Chris
  
 These are routine tasks to be performed in and around the lab every evening to prepare the array for regular observations. Note that there is a new Daily Alignment Check Procedure for configurations that do not change night to night. Use it instead of the full alignment given here. These are routine tasks to be performed in and around the lab every evening to prepare the array for regular observations. Note that there is a new Daily Alignment Check Procedure for configurations that do not change night to night. Use it instead of the full alignment given here.
Line 135: Line 141:
 For MIRCX, the same target should be placed in the clamps on the MIRCX table. Place the target to the appropriate table, making sure it seats firmly in the clamps. Place the small corner cubes (labeled) on their bases at the BRTs. Make sure they seat firmly and correctly. Open IR shutters, send laser light using VISBEAMS gui to the position you want to check. Use a tablet to bring up Pico 2 gui. Click on icon or in xterm type: xpico2. Select the appropriate IR mirror for the beam you are about to adjust. For ex: S1IR. The Beam Sampler gui tells you which telescope is in the beam you are aligning. When done for all telescope to be used, remove target and place it above the CLASSIC/CLIMB table and remove corner cubes from their stands and place them to the side of the beam path. For MIRCX, the same target should be placed in the clamps on the MIRCX table. Place the target to the appropriate table, making sure it seats firmly in the clamps. Place the small corner cubes (labeled) on their bases at the BRTs. Make sure they seat firmly and correctly. Open IR shutters, send laser light using VISBEAMS gui to the position you want to check. Use a tablet to bring up Pico 2 gui. Click on icon or in xterm type: xpico2. Select the appropriate IR mirror for the beam you are about to adjust. For ex: S1IR. The Beam Sampler gui tells you which telescope is in the beam you are aligning. When done for all telescope to be used, remove target and place it above the CLASSIC/CLIMB table and remove corner cubes from their stands and place them to the side of the beam path.
  
-2.5 Starting up OPLE and Metrology+2.5 Final steps in the lab 
 + 
 +If using CLASSIC or CLIMB, turn on the black box above the NIRO computer, and then turn on the silver box below it on the same cart. Remove cover on camera. After lab is completely setup, you need to take off tiptilt cover if using lab tiptilt, but do so with only the dim lights on and the laser shutter closed so as not to blast CCD with light. 
 + 
 +2.6 Starting up OPLE and Metrology (Added 08/10/21 - Chris)
  
-Go to OPLE racks and turn on OPLE Power on top unit (top of left most rack) This is the VME. Turn on power for surge protector (bottom of left most rack), turn on power for amplifiers for cart movement and cable pullers and once the central red light on the VME rack goes out, turn on the Burleigh amplifiers for telescopes that will be used.\\ 
-To test cart motions: On computer outside lab, bring up Primary Ople Server, type in "syncople" in the server, and make sure the ople time matches the CHARA time. Go inside lab to check carts. From pull-down menu, under GTK, open Primary OPLE GUI, click on [STATUS], click on [CONTROL]. On the OPLE Control, click on [FRONT] - listen - [OFF] (can hit all in succession, then hit [ALL OFF]) If there is any squeaking noise (low hum ok), stop carts. Possible fix: to shut off and turn back on OPLE racks, restart OPLE server\\ 
-Check delay line wires on carts, make sure nothing is on tracks\\ 
 \\ \\
 On the Metrology table inside the lab, turn on two blue amplifiers for metrology laser (on button is labeled "line") The units will hum when on. Turn the key to ON on the laser power box to put metrology laser on standby. On the Metrology table inside the lab, turn on two blue amplifiers for metrology laser (on button is labeled "line") The units will hum when on. Turn the key to ON on the laser power box to put metrology laser on standby.
  
-2.6 Final steps in the lab+Finish what you are doing in the lab, go out to the computer area, turn the laser signal on, and go back to the control room to complete alignment for 30 minutes while the laser warms up.
  
-If using CLASSIC or CLIMBturn on the black box above the NIRO computer, and then turn on the silver box below it on the same cart. Remove cover on camera. After lab is completely setup, you need to take off tiptilt cover if using lab tiptiltbut do so with only the dim lights on and the laser shutter closed so as not to blast CCD with light.+After the laser is warmed upcheck sockman for old OPLE"X" servers (where X is 1-6) and remove any that may be on the sockman list. 
 + 
 +If the OPLE System Control gui is not already running on zootyou can start the gui with the following command (This will be put into the menu system or an icon soon) 
 + 
 +ssh -Y ople /opt/bin/OPLERemCtrlApp 
 + 
 +The gui that appears does much of the start up sequence remotely and does not fully start everything yet. This will eventually only require fewer steps to complete. 
 + 
 +{{https://mail.google.com/mail/u/1|OPLE System Ctrl.png}} 
 + 
 +When the laser is onthe circle marked Laser will be green and the wattage listed will be close to 80mw (instead of 20mW when off) 
 + 
 +All the circle indicators start out grey. 
 + 
 +After the 30 minute warmup, press the Metro button which will power up the Metrology cage, the laser repeater and the oscilloscope. When button indicator is green, you can proceed to the next step. 
 + 
 +Press the Start button near the bottom. This will start up the computersand the first stage of hardware and takes about 90 seconds to complete. The grey buttons will turn yellow with a blue icon when the computers have started up, but not loaded the drivers yet. They will then turn solid yellow when they are ready for the next step and have loaded all the drivers. 
 + 
 +Once all 6 are solid yellow, right click on each yellow dot, and select start. This loads the control software and will turn the button green. Once all 6 are green, you are ready to start the OPLE server. 
 + 
 +Once the OPLE server has fully started, (IF running MIRC) please check sockman for CHAMPtoMet. If it is running, then MIRC is ok to start. If it is not running, log into the ople computer and run the command : CHAMPtoMet This is case sensitive. 
 + 
 +Now the MIRC server is ok to start.
  
 \\ \\
Line 319: Line 348:
 6.6 Finish shutting down in the control room 6.6 Finish shutting down in the control room
  
-If using Classic or CLIMB, check to make sure the dither is off by looking at the dither status in the CLASSIC/CLIMB server. If necessary, this can be turned off from the dither tab on the Classic/CLIMB GUI. They are off when gray. Shut off [METSCOPE], [NIRO CPU], and [CLS-DITH], or [CLM-DITH] if used on the POWER gui. Close the OPLE, Tiptilt, CLIMB/CLASSIC GUIs Close the OPLE, Tiptilt, and CLIMB/CLASSIC servers, type CTRL+C, then Y, Visually check all telescopes in the spycams to make sure all covers and slits are closed. Turn the TV OFF. Leave GPS, Metrol, and Vacmon servers and the Telescope servers open and running+If using Classic or CLIMB, check to make sure the dither is off by looking at the dither status in the CLASSIC/CLIMB server. If necessary, this can be turned off from the dither tab on the Classic/CLIMB GUI. They are off when gray. Shut off [METSCOPE], [NIRO CPU], and [CLS-DITH], or [CLM-DITH] if used on the POWER gui. Close the OPLE, Tiptilt, CLIMB/CLASSIC GUIs Close the Tiptilt, and CLIMB/CLASSIC servers, type CTRL+C, then Y, Visually check all telescopes in the spycams to make sure all covers and slits are closed. Turn the TV OFF. Leave GPS, Metrol, and Vacmon servers and the Telescope servers open and running 
 + 
 +Shut down the ople control system (Added 08/10/2021 - Chris) 
 + 
 +Close the OPLE server. 
 + 
 +Press the shutdown button on the OPLE System Control gui, wait until all 6 dots are grey, press the Metro button, and wait until it is grey, turn off the metrology laser.
  
 6.7 Shutting down the Lab\\ 6.7 Shutting down the Lab\\
 \\ \\
 Go to the lab and close the vacuum valves for all telescope lines (valve handle turned perpendicular to the tube). Go outside to the pump shack and close the vacuum valve. Then shut off the vacuum pump. Note any unusual noises or excessive oil temps (above 54 C) reported by the thermometer. Let Larry know of any concerns. Lock the padlock.\\ Go to the lab and close the vacuum valves for all telescope lines (valve handle turned perpendicular to the tube). Go outside to the pump shack and close the vacuum valve. Then shut off the vacuum pump. Note any unusual noises or excessive oil temps (above 54 C) reported by the thermometer. Let Larry know of any concerns. Lock the padlock.\\
-In the computer area of the lab: Turn off the Burleigh amplifiers, the amplifiers for cart movement, and the cable pullers. Turn off the power for the surge protector (black box, bottom left of VME rack). Turn off the VME, top of the left rack\\ 
 Go inside the lab with booties: With the dim lights on, put the tiptilt cover back on the tiptilt camera. Turn off the silver box, then black box for NIRO and replace the NIRO camera cover if used. Turn off the key for the green alignment laser and turn the power switch off. Turn off Pico 3 controller above the tiptilt camera. Turn off the blue amplifiers for the metrology laser (button is labeled "line") * Turn off the key for the metrology laser and place it on top of the laser box. Shut off lights when exiting the lab building. Return your booties to the basket if good or to the trash if they have holes in them. Make sure all doors are closed as you leave. Go inside the lab with booties: With the dim lights on, put the tiptilt cover back on the tiptilt camera. Turn off the silver box, then black box for NIRO and replace the NIRO camera cover if used. Turn off the key for the green alignment laser and turn the power switch off. Turn off Pico 3 controller above the tiptilt camera. Turn off the blue amplifiers for the metrology laser (button is labeled "line") * Turn off the key for the metrology laser and place it on top of the laser box. Shut off lights when exiting the lab building. Return your booties to the basket if good or to the trash if they have holes in them. Make sure all doors are closed as you leave.
  
chara/operating_procedures.txt · Last modified: 2023/09/01 02:50 by gail_stargazer