User Tools

Site Tools


chara:operating_procedures

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
chara:operating_procedures [2020/02/04 18:28]
charaobs
chara:operating_procedures [2021/11/04 16:53]
charaobs
Line 14: Line 14:
 __**SUPPLEMENTAL INFORMATION**__ \\ __**SUPPLEMENTAL INFORMATION**__ \\
 [[:chara:remote_observing|Remote Observing]]\\ [[:chara:remote_observing|Remote Observing]]\\
-[[:chara:power_outage|Power Outage]]\\+[[:chara:power_outage|Shutting Down prior to a Power Outage]]\\ 
 +[[:chara:power_recovery|Recovering from a Power Outage]]\\
 [[:chara:trouble_shooting|Trouble Shooting]]\\ [[:chara:trouble_shooting|Trouble Shooting]]\\
 [[:chara:text_commands_for_chara_guis|Text Commands for CHARA GUIs]]\\ [[:chara:text_commands_for_chara_guis|Text Commands for CHARA GUIs]]\\
Line 23: Line 24:
 [[https://docs.google.com/document/d/1b1f0pgeeKOx5NO-jUOCbFM-e7b9GL8iBMFijD1B3Qc8/edit#|Telescope AO User Manual]]\\ [[https://docs.google.com/document/d/1b1f0pgeeKOx5NO-jUOCbFM-e7b9GL8iBMFijD1B3Qc8/edit#|Telescope AO User Manual]]\\
 [[https://docs.google.com/document/d/1TnLxWaAw42DZwh7l6_wPfe_CpIfT935_aShK0ymBX1o|WFS TT Alignment and Usage]]\\ [[https://docs.google.com/document/d/1TnLxWaAw42DZwh7l6_wPfe_CpIfT935_aShK0ymBX1o|WFS TT Alignment and Usage]]\\
-[[https://docs.google.com/document/d/1UY5C8Pkbi_yd448aF_TXXE9KFkwjd5VK3LALvkFahjQ/|Coude alignment (daytime)]]\\ +{{:chara:files:tiptilt_splitters_change.pdf|Tip-tilt Splitters Change}} \\ 
-{{:chara:files:tiptilt_splitters_change.pdf|Tip-tilt Splitters Change}}+{{:chara:files:beaconrecoveryinstructions.pdf|E2 AOB Dichroic Recovery Document}} \\ 
 +{{:chara:files:e1_hut_coms_recovery.pdf|E1 HuT and Cooler Communications Recovery}}
  
-[[:chara:azimuth_coude_alignments|Azimuth coudé alignments]]\\+{{:chara:files:twfs_faint_objects.pdf|TWFS Faint Object Instructions}} \\ 
 +[[:chara:coude_alignment_procedure|Coude alignment procedure]] - Updated 2021Jun01\\
 [[:chara:horizons|Telescope Horizon Limits]]\\ [[:chara:horizons|Telescope Horizon Limits]]\\
 [[:chara:restarting_servers|Restarting Servers]]\\ [[:chara:restarting_servers|Restarting Servers]]\\
Line 33: Line 36:
 [[:chara:instruments|Observing Logs]]\\ [[:chara:instruments|Observing Logs]]\\
 [[:chara:fringe_offsets|Recent fringe offsets]]\\ [[:chara:fringe_offsets|Recent fringe offsets]]\\
 +[[:chara:glass_offsets|Recent glass offsets]]\\
 [[:chara:instruments|Software setup for specific instruments]]\\ [[:chara:instruments|Software setup for specific instruments]]\\
-[[:chara:classic_faint_object_procedures|Classic Faint Object Procedures]]\\+[[:chara:classic_faint_object_procedures|Classic Faint Object Procedures]] 
 + 
 +\\
 \\ \\
 __**DOCUMENTATION TO BE UPDATED**__ \\ __**DOCUMENTATION TO BE UPDATED**__ \\
Line 40: Line 46:
 \\ \\
 CHARA Array Operating Procedures\\ CHARA Array Operating Procedures\\
-Copyright © 2005-2020 The CHARA Team\\ +Copyright © 2005-2021 The CHARA Team\\ 
-Last updated: 2020-1-22\\+Last updated: 2021-08-10\\
 \\ \\
 \\ \\
Line 79: Line 85:
 === Preparations in the Lab Prior to Observing === === Preparations in the Lab Prior to Observing ===
  
-27 AUG 2012 by Judit, Current version 17 JAN 2020 by Norm+27 AUG 2012 by Judit, Current version 10 Aug 2021 by Chris
  
 These are routine tasks to be performed in and around the lab every evening to prepare the array for regular observations. Note that there is a new Daily Alignment Check Procedure for configurations that do not change night to night. Use it instead of the full alignment given here. These are routine tasks to be performed in and around the lab every evening to prepare the array for regular observations. Note that there is a new Daily Alignment Check Procedure for configurations that do not change night to night. Use it instead of the full alignment given here.
Line 85: Line 91:
 2.1 Starting the vacuum pump for the light pipes 2.1 Starting the vacuum pump for the light pipes
  
-Go into vacuum pump shack. Flip on power switch for pump (wait for blower to go on) Open valve slowly (parallel to pipe means open) Note if fan cords are plugged into wall outlet to keep pumps cool. Note oil temperature when you start up. Oil temps below 20º C make for a labored start. Inform Larry if the oil temp is low and the heater did not run to bring the temp up before starting.\\ +Go into vacuum pump shack. Flip on power switch for pump (wait for blower to go on) Open valve slowly (parallel to pipe means open) Note if fan cords are plugged into wall outlet to keep pumps cool. Note oil temperature when you start up. Oil temps below 15º C make for a labored start. There is currently a block heater on the north side of the pump and a space heater on the south side.  Inform Larry if the oil temp is low and the heaters did not run to bring the temp up before starting.\\ 
-Go into lab building, check pressures on Vacmon display. If pressure is higher than 100 torr in any of the lines, pump those lines only one at a time. Open valve a little, then come back to open fully. When all lines to be used are well below 100 torr, open all those valves. The final pressure should be 0.5 - 1.0 Torr in each line. The pump will normally bring all 6 lines down to .2-.3 Torr. The S1 and S2 lines leak the most during the day and will read the highest in the afternoon when you return, usually around 10 and 20 Torr. Note any unusual vacuum readings as they can indicate a leak beyond what is normal. Sometimes a line isn't pumped down the night before and can read higher than 30 Torr. Pump the highest ones down first as stated above.+Go into lab building, check pressures on Vacmon display. If pressure is higher than 100 torr in any of the lines, pump those lines only one at a time. Open valve a little, then come back to open fully. When all lines to be used are well below 100 torr, open all those valves. The final pressure should be 0.5 - 1.0 Torr in each line. The pump will normally bring all 6 lines down to .2-.3 Torr. The S1 and S2 lines leak the most during the day and will read the highest in the afternoon when you return, usually between 10-20 Torr in the summer and 20-30 Torr in the winter. Note any unusual vacuum readings as they can indicate a leak beyond what is normal. Sometimes a line isn't pumped down the night before and can read higher than 30 Torr. Pump the highest ones down first as stated above.
  
 2.2 Filling NIRO with LN2\\ 2.2 Filling NIRO with LN2\\
Line 94: Line 100:
  
 2.3 Alignment of the light path to the telescopes\\ 2.3 Alignment of the light path to the telescopes\\
-Go into the lab. The green alignment laser on the light source table is used. To open necessary guis, use laptops or the two tablets inside lab. Tablets are the newest hand held units and are located on the west and south walls plugged into chargers.\\+Go into the lab. The green alignment laser on the light source table is used. To open necessary guis, use laptops or the tablet inside lab. The tablet or laptop are located on the table next to the MIRCX/MYSTIC table and are plugged into chargers.\\
 \\ \\
 2.3.1 In the lab (Beam Combination area) Turn on power switch for alignment laser, and turn the key. Above the tiptilt camera, turn on the Pico 3 controller. 2.3.1 In the lab (Beam Combination area) Turn on power switch for alignment laser, and turn the key. Above the tiptilt camera, turn on the Pico 3 controller.
Line 100: Line 106:
 2.3.2 Laser alignment to east table 2.3.2 Laser alignment to east table
  
-Check the laser spots on the E table target at North wall of Beam Switching area. On Laser Filter gui, select ND 0.0 Make sure VEGA periscope is UP. Open LASER shutter on the SHUTTERS gui and open shutters for the beams you are going to use. Using the VISBEAMS gui, move the laser to the first beam pair you will check, ie. Beams 1&2. Using the Beam Samplers gui, move beam samplers off of the beams you will align. Check each spot that is going to be used on each pair (for ex. 1&2, 2&3, 3&4, etc.) Use Pico3 gui to center laser dots on cross hairs. Be mindful of which pair was selected with VISBEAMS. (1&2-2 and 2&3-2 appear at the same spot, but different pieces of optics are involved) Use the Beam Samplers gui to put telescopes back on the appropriate beams. Note that when multiple telescope/beam configurations are requested, aligning to the secondary configuration or back up telescopes first, then finishing with the primary configuration is more efficient.\\+Check the laser spots on the E table target at North wall of Beam Switching area. On Laser Filter gui, select ND 0.0 Open LASER shutter on the SHUTTERS gui and open shutters for the beams you are going to use. Using the VISBEAMS gui, move the laser to the first beam pair you will check, ie. Beams 1&2. Using the Beam Samplers gui, move beam samplers off of the beams you will align. Check each spot that is going to be used on each pair (for ex. 1&2, 2&3, 3&4, etc.) Use Pico3 gui to center laser dots on cross hairs. Be mindful of which pair was selected with VISBEAMS. (1&2-2 and 2&3-2 appear at the same spot, but different pieces of optics are involved) Use the Beam Samplers gui to put telescopes back on the appropriate beams. Note that when multiple telescope/beam configurations are requested, aligning to the secondary configuration or back up telescopes first, then finishing with the primary configuration may be more efficient.\\
 If the telescopes were used on the same beam on the previous night, the next steps may be very close and should not need much if any adjustment.\\ If the telescopes were used on the same beam on the previous night, the next steps may be very close and should not need much if any adjustment.\\
 \\ \\
Line 116: Line 122:
 2.3.6 M10 Alignment 2.3.6 M10 Alignment
  
-Go to a computer anywhere to check the beam remotely at the telescopes. Check Vacuum Monitor that the vacuum is below 20 torr. Open telescope gui from pull down menu. Click TV [ON] to open the camera window and click [M10AL] to change view to the M10 alignment view, click [M7 open] to open the M7 mirror cover. Center bright spot in beam on the black reference spot. You may need to adjust the IRIS or the TV brightness to see the bright spot well. [BEAM] cycles the iris from open to closed and gives a good idea of where the center of the spot is. To adjust the position, use Pico 2 to select, for example, E2M10 → [MOVE] (use large steps ~ 100). Note that the up, down, left, and right buttons do no correspond to the actual directions the spot will move. When the spot is centered, click [M7 close] to close the mirror cover * click TV [OFF] to close the window+Go to a computer anywhere to check the beam remotely at the telescopes. Check Vacuum Monitor that the vacuum is below 20 torr. Open telescope gui from pull down menu. Click TV [ON] to open the camera window and click [M10AL] to change view to the M10 alignment view, click [M7 open] to open the M7 mirror cover. Center bright spot in beam on the black reference spot. (Note that S2 has a double spot in the center and a single spot to the lower right. The double spot is the correct one.) You may need to adjust the IRIS or the TV brightness to see the bright spot well. [BEAM] cycles the iris from open to closed and gives a good idea of where the center of the spot is. To adjust the position, use Pico 2 to select, for example, E2M10 → [MOVE] (use large steps ~ 100). Note that the up, down, left, and right buttons do no correspond to the actual directions the spot will move. When the spot is centered, click [M7 close] to close the mirror cover * click TV [OFF] to close the window
  
 \\ \\
Line 133: Line 139:
 For CLIMB 1 and CLIMB 2, the removable 6-beam target should be placed in the clamps on the CLIMB table. This also applies to aligning CLIMB for fringe tracking for VEGA or fringe finding for PAVO.\\ For CLIMB 1 and CLIMB 2, the removable 6-beam target should be placed in the clamps on the CLIMB table. This also applies to aligning CLIMB for fringe tracking for VEGA or fringe finding for PAVO.\\
 \\ \\
-For MIRCX, the same target should be placed in the clamps on the MIRCX table. Place the target to the appropriate table, making sure it seats firmly in the clamps. Place the small corner cubes (labeled) on their bases at the BRTs. Make sure they seat firmly and correctly. Open IR shutters, send laser light using VISBEAMS gui to the position you want to check. Use a tablet to bring up Pico 2 gui. Click on icon or in xterm type: xpico2. Select the appropriate IR mirror for the beam you are about to adjust. For ex: S1IR. The Beam Sampler gui tells you which telescope is in the beam you are aligning. When done for all telescope to be used, remove target and place it above the CLASSIC/CLIMB table and remove corner cubes from their stands and place them to the side of the beam path.+For MIRCX, the same target should be placed in the clamps on the MIRCX table. Place the target to the appropriate table, making sure it seats firmly in the clamps. Place the small corner cubes (labeled) on their bases at the BRTs. Make sure they seat firmly and correctly. Open IR shutters, send laser light using VISBEAMS gui to the position you want to check. Use a tablet to bring up Pico 2 gui. Click on icon or in xterm type: xpico2. Select the appropriate IR mirror for the beam you are about to adjust. For ex: S1IR. The Beam Sampler gui tells you which telescope is in the beam you are aligning. When done for all telescope to be used, remove target and place it above the CLASSIC/CLIMB table and remove corner cubes from their stands and place them to the side of the beam path. Remove the labao camera covers after you remove the corner cubes from their bases.
  
-2.5 Starting up OPLE and Metrology+2.5 Final steps in the lab 
 + 
 +If using CLASSIC or CLIMB, turn on the black box above the NIRO computer, and then turn on the silver box below it on the same cart. Remove cover on camera. Note which filter is reported on the filter wheel. If using MIRCX/MYSTIC, be sure to confirm the correct Prism or Grism is in. 
 + 
 +2.6 Starting up the new OPLE system and Metrology (Added 08/10/21 - Chris)
  
-Go to OPLE racks and turn on OPLE Power on top unit (top of left most rack) This is the VME. Turn on power for surge protector (bottom of left most rack), turn on power for amplifiers for cart movement and cable pullers and once the central red light on the VME rack goes out, turn on the Burleigh amplifiers for telescopes that will be used.\\ 
-To test cart motions: On computer outside lab, bring up Primary Ople Server, type in "syncople" in the server, and make sure the ople time matches the CHARA time. Go inside lab to check carts. From pull-down menu, under GTK, open Primary OPLE GUI, click on [STATUS], click on [CONTROL]. On the OPLE Control, click on [FRONT] - listen - [OFF] (can hit all in succession, then hit [ALL OFF]) If there is any squeaking noise (low hum ok), stop carts. Possible fix: to shut off and turn back on OPLE racks, restart OPLE server\\ 
-Check delay line wires on carts, make sure nothing is on tracks\\ 
 \\ \\
 On the Metrology table inside the lab, turn on two blue amplifiers for metrology laser (on button is labeled "line") The units will hum when on. Turn the key to ON on the laser power box to put metrology laser on standby. On the Metrology table inside the lab, turn on two blue amplifiers for metrology laser (on button is labeled "line") The units will hum when on. Turn the key to ON on the laser power box to put metrology laser on standby.
  
-2.6 Final steps in the lab+Finish what you are doing in the lab, go out to the computer area, turn the laser signal on, and go back to the control room to complete alignment for 30 minutes while the laser warms up. 
 + 
 +After the laser is warmed up, check sockman for old OPLE"X" servers (where X is 1-6) and remove any that may be on the sockman list. 
 + 
 +If the OPLE System Control gui is not already running on wazoo, you can start the gui with the following command (This will be put into the menu system or an icon soon) 
 + 
 +ssh -Y ople /opt/bin/OPLERemCtrlApp 
 + 
 +The gui that appears does much of the start up sequence remotely and does not fully start everything yet. This will eventually only require fewer steps to complete. 
 + 
 +{{https://mail.google.com/mail/u/1|OPLE System Ctrl.png}} 
 + 
 +When the laser is on, the circle marked Laser will be green and the wattage listed will be close to 80mw (instead of 20mW when off) 
 + 
 +All the circle indicators start out grey. 
 + 
 +After the 30 minute warmup, press the Metro button which will power up the Metrology cage, the laser repeater and the oscilloscope. When button indicator is green, you can proceed to the next step. 
 + 
 +Press the Start button near the bottom. This will start up the computers, and the first stage of hardware and takes about 90 seconds to complete. The grey buttons will turn yellow with a blue icon when the computers have started up, but not loaded the drivers yet. They will then turn solid yellow when they are ready for the next step and have loaded all the drivers. (Note: E1 has often failed to start and will need to be powered on manually by the rocker switch behind the right, front cover of the E1 ople computer) 
 + 
 +Once all 6 are solid yellow, right click on each yellow dot, and select start. This loads the control software and will turn the button green. Once all 6 are green, you are ready to start the OPLE server. 
 + 
 +If using the CHAPMtoMet feature, once the OPLE server has fully started, please check sockman for CHAMPtoMet. If it is running, then MIRC is ok to start. If it is not running, log into the ople computer and run the command : CHAMPtoMet This is case sensitive.
  
-If using CLASSIC or CLIMB, turn on the black box above the NIRO computer, and then turn on the silver box below it on the same cart. Remove cover on camera. After lab is completely setup, you need to take off tiptilt cover if using lab tiptilt, but do so with only the dim lights on and the laser shutter closed so as not to blast CCD with light.+Now the MIRC server is ok to start. Be sure to inform the MIRCX/MYSTIC PI that you are done in the lab and that it is ok to start any alignments or STS recording that is desired.
  
 \\ \\
Line 151: Line 180:
 === Setting up Computer in the Control Room === === Setting up Computer in the Control Room ===
  
-Updated 17 DEC 2019 by Norm+Updated 04 NOV 2021 by Norm
  
 3.1 General Overview of Control Room computer setup 3.1 General Overview of Control Room computer setup
Line 159: Line 188:
 3.2 Setting up for observing 3.2 Setting up for observing
  
-Turn on the following from the POWER GUI: To change the setting on the power GUI, unclick LOCK, make change, re-click LOCK. Under RACK_2, turn on [METSCOPE] (button will turn green when ON). If observing with CLASSIC, turn on [NIRO CPU] and [CLS-DITH] on RACK_2. If observing with CLIMB, turn on [NIRO CPU] on RACK_2 and [CLM-DITH] on RACK_3. For each telescope using lab tiptilt, turn on [TIP/TILT].+Turn on the following from the POWER GUI: To change the setting on the power GUI, unclick LOCK, make change, re-click LOCK. Under RACK_2, turn on [METSCOPE] (button will turn green when ON). If observing with CLASSIC or CLIMB2, turn on [NIRO CPU] and [CLS-DITH] on RACK_2. If observing with CLIMB1, turn on [NIRO CPU] on RACK_2 and [CLM-DITH] on RACK_3. For each telescope using lab tiptilt, turn on [TIP/TILT].
  
 3.3 Servers required for observing 3.3 Servers required for observing
Line 167: Line 196:
 3.4 Open Telescope guis, or obsgtks from icons on desktop 3.4 Open Telescope guis, or obsgtks from icons on desktop
  
-3.5 Open GUIs required for observing from the menu under GTK or the desktop icons: Open Primary OPLE gui, Open Classic, Climb1, or Climb2 gui if needed, Open LDC1 and LDC2 if VEGA or PAVO programs are observing. Open Tiptilt GUIThis will bring up Tiptilt GUI and Tiptilt viewing screens for all telescopes. Move viewing screens near telescope TV screens as needed.+3.5 Open GUIs required for observing from the menu under GTK or the desktop icons: Open Primary OPLE gui, Open Classic, Climb1, or Climb2 gui if needed, Open LDC1 and LDC2 if PAVO program is observing. If using Lab Tiptilt, open Tiptilt GUI.
  
 3.6 Using the Cosmic Debris job sequencer 3.6 Using the Cosmic Debris job sequencer
  
-Open Cosmic Debris, CD for short, from the desktop icon. On the CONFIGURE tab, check to make sure the PoPs and telescope beam assignments agree with the white board or the setup email. If the POPs are wrong on CD, then open the "PoPs" gui, click on the [Overview] button on the PoPs gui. If nonsense comes up in the overview, then click [FLUSH] and then [REOPEN] on the PoPs gui, then click [UPDATE] on the PoPs Overview. If the PoPs Overview is now correct, then click the [GET] button on the CD Control Tab, this should update the PoPs. If the beams are not assigned correctly, move the beams accordingly to the proper telescope using the BeamSampler GUI and click [GET] on CD to update. Select the active telescopes on the tab labeled "Configure", choose a suitable reference cart, using the same one from the night before to make fringe finding easier. After everything is set correctly, then click [SEND] on Cosmic Debris to send the active scope information to Ople.\\ +Open Cosmic Debris, CD for short, from the desktop icon. On the CONFIGURE tab, check to make sure the PoPs and telescope beam assignments agree with the white board or the setup email. If the POPs are wrong on CD, then open the "PoPs" gui, click on the [Overview] button on the PoPs gui. If nonsense comes up in the overview, then click [FLUSH] and then [REOPEN] on the PoPs gui, then click [UPDATE] on the PoPs Overview. If the PoPs Overview is now correct, then click the [GET] button on the CD Control Tab, this should update the PoPs. If the beams are not assigned correctly, move the beams accordingly to the proper telescope using the BeamSampler GUI and click [GET] on CD to update. These values can all be set manually if the GET function does not set them correctly. Select the active telescopes on the tab labeled "Configure", choose a suitable reference cart, using the same one from the night before to make fringe finding easier. After everything is set correctly, then click [SEND] on Cosmic Debris to send the active scope information to Ople.\\ 
-Set the instrument and settings on Cosmic Debris. On the "Control" tab on Cosmic Debris, select the beam combiner or combiners to be used. If using CLIMB or CLASSIC, also select the filter and beam\\+Set the instrument and settings on Cosmic Debris. On the "Control" tab on Cosmic Debris, select the beam combiner or combiners to be used. If using CLIMB or CLASSIC, also select the filter (H,K'and beams (1/2, 2/3, 3/1). 
 + 
 +(This section is obsolete with the retiring of the old lab tiptilt)\\
 Establish connection between tiptilt and the telescopes. On the Control Tab on Cosmic Debris, click on [TIPTILT COMM]. Click [START JOB QUEUE] on CD to continue the Tiptilt Communication sequence. After several seconds, the telescope servers will indicate that the Socket (SOC) connection is established and turn on the tiptilt rate display. Cosmic Debris will usually display a lower rate, such as 42Hz, to indicate tiptilt is running. The servers will display 158Hz to show a proper functioning of the tiptilt system. If the connection is not established the first time, try again until CD shows rates for each telescope used. If a telescope server will not display a TT signal rate, you may need to shut it down and restart it. Once the telescope WFS's are used for tiptilt, these steps for the lab tiptilt will not be used.\\ Establish connection between tiptilt and the telescopes. On the Control Tab on Cosmic Debris, click on [TIPTILT COMM]. Click [START JOB QUEUE] on CD to continue the Tiptilt Communication sequence. After several seconds, the telescope servers will indicate that the Socket (SOC) connection is established and turn on the tiptilt rate display. Cosmic Debris will usually display a lower rate, such as 42Hz, to indicate tiptilt is running. The servers will display 158Hz to show a proper functioning of the tiptilt system. If the connection is not established the first time, try again until CD shows rates for each telescope used. If a telescope server will not display a TT signal rate, you may need to shut it down and restart it. Once the telescope WFS's are used for tiptilt, these steps for the lab tiptilt will not be used.\\
 Finish setting up tiptilt GUIs. Click re-open on the Tiptilt GUI. This will update the TT labels on the TT viewing screens from B1,B2,etc to the telescope names. Click on the [SERVO CONTROL] tab on the tiptilt GUI to bring up a second window and move to screen 5 with the telescope guis. The Servo Control GUI allows you to turn ON the servo for the TT loop and make biases for individual beams (DBIAS and ZBIAS) Finish setting up tiptilt GUIs. Click re-open on the Tiptilt GUI. This will update the TT labels on the TT viewing screens from B1,B2,etc to the telescope names. Click on the [SERVO CONTROL] tab on the tiptilt GUI to bring up a second window and move to screen 5 with the telescope guis. The Servo Control GUI allows you to turn ON the servo for the TT loop and make biases for individual beams (DBIAS and ZBIAS)
Line 252: Line 283:
 5.1 Opening the Telescope Domes and enclosures\\ 5.1 Opening the Telescope Domes and enclosures\\
 \\ \\
-You can begin opening the telescope domes and enclosures about an hour or two before sunset. This will help air out the domes and improve seeing at the start of the night. Hot days benefit from an earlier opening to allow the scopes to cool. Before opening the domes make sure to check the current weather conditions and the forecast to make sure conditions are safe to open and are likely to be stable as you wait for it to get dark. Also confirm that Judit or Robert have finished the alignments in the lab as opening the domes will not allow the completion of the beacon alignments. Call the computer room at #424 if you do not see either of them. Monitor the progress of opening the domes by turning the televisions [ON] using the telescope GUIs. Click [SPY1] to view the dome slit. In the summer, when the sun is higher overhead, use the Dome GUI for each telescope to position the domes in the anti-sun position using the RA/DEC tab and the ANTI-SUN setting for AUTODOME. This will position the dome slit opposite the sun so that you can open the slit well before sunset. You may also go to the Dome Tab on the Dome GUI, enter 100 in the text box on the right, and press [GOTO]. This will move the dome slit to the east. When the domes are facing east (and all lab alignments are finished), click [SLIT OPEN] on the Control Tab of the telescope GUI to open the dome slit. On the enclosure GUI, click the [OBSERVE] button to open the lower cylinders to the observe position. Wait for the slit and enclosures to open to .300 and then wait for the sun to go down.+You can begin opening the telescope domes and enclosures at least two hours before sunset. The white board has times written down that the domes can be fully opened.  This happens when the sun is below 35º.  Before this time, the domes can be vented by partially opening them. This will help air out the domes and improve seeing at the start of the night. Hot days benefit from an earlier opening to allow the scopes to cool. Before opening the domes make sure to check the current weather conditions and the forecast to make sure conditions are safe to open and are likely to be stable as you wait for it to get dark. Also confirm that Robert or Narsi have finished the alignments in the lab or the control room as opening the domes may interupt their alignments. Call the computer room at #424 if you do not see either of them. Monitor the progress of opening the domes by turning the televisions [ON] using the telescope GUIs. Click [SPY1] to view the dome slit. In the summer, when the sun is higher overhead, use the Dome GUI for each telescope to position the domes in the anti-sun position using the RA/DEC tab and the ANTI-SUN setting for AUTODOME. This will position the dome slit opposite the sun so that you can open the slit well before sunset. You may also go to the Dome Tab on the Dome GUI, manually enter an anti-sun azimuth value from 70º-110º in the text box on the right, and press [GOTO]. This will move the dome slit to the east and opposite the sun. When the domes are facing east (and all labalignments, dichroic changes or coude alignments are finished), click [UNL SL] and [SLIT] on the Control Tab of the obsgtk GUI to open the dome slit fullyIf opening very early, use [UNL SL] and [VENT] to open it halfway.  Be sure to open them fully when the sun has reached 35º for maximum cooling. 
 + 
 +[NOT YET OPERATIONAL]  On the enclosure GUI, click the [OBSERVE] button to open the lower cylinders to the observe position. Wait for the slit and enclosures to open to .300 and then wait for the sun to go down.
  
 5.2 Opening telescope optics\\ 5.2 Opening telescope optics\\
Line 319: Line 352:
 6.6 Finish shutting down in the control room 6.6 Finish shutting down in the control room
  
-If using Classic or CLIMB, check to make sure the dither is off by looking at the dither status in the CLASSIC/CLIMB server. If necessary, this can be turned off from the dither tab on the Classic/CLIMB GUI. They are off when gray. Shut off [METSCOPE], [NIRO CPU], and [CLS-DITH], or [CLM-DITH] if used on the POWER gui. Close the OPLE, Tiptilt, CLIMB/CLASSIC GUIs Close the OPLE, Tiptilt, and CLIMB/CLASSIC servers, type CTRL+C, then Y, Visually check all telescopes in the spycams to make sure all covers and slits are closed. Turn the TV OFF. Leave GPS, Metrol, and Vacmon servers and the Telescope servers open and running+If using Classic or CLIMB, check to make sure the dither is off by looking at the dither status in the CLASSIC/CLIMB server. If necessary, this can be turned off from the dither tab on the Classic/CLIMB GUI. They are off when gray. Shut off [METSCOPE], [NIRO CPU], and [CLS-DITH], or [CLM-DITH] if used on the POWER gui. Close the OPLE, Tiptilt, CLIMB/CLASSIC GUIs Close the Tiptilt, and CLIMB/CLASSIC servers, type CTRL+C, then Y, Visually check all telescopes in the spycams to make sure all covers and slits are closed. Turn the TV OFF. Leave GPS, Metrol, and Vacmon servers and the Telescope servers open and running 
 + 
 +Shut down the ople control system (Added 08/10/2021 - Chris) 
 + 
 +Close the OPLE server. 
 + 
 +Press the shutdown button on the OPLE System Control gui, wait until all 6 dots are grey, press the Metro button, and wait until it is grey, turn off the metrology laser.
  
 6.7 Shutting down the Lab\\ 6.7 Shutting down the Lab\\
 \\ \\
 Go to the lab and close the vacuum valves for all telescope lines (valve handle turned perpendicular to the tube). Go outside to the pump shack and close the vacuum valve. Then shut off the vacuum pump. Note any unusual noises or excessive oil temps (above 54 C) reported by the thermometer. Let Larry know of any concerns. Lock the padlock.\\ Go to the lab and close the vacuum valves for all telescope lines (valve handle turned perpendicular to the tube). Go outside to the pump shack and close the vacuum valve. Then shut off the vacuum pump. Note any unusual noises or excessive oil temps (above 54 C) reported by the thermometer. Let Larry know of any concerns. Lock the padlock.\\
-In the computer area of the lab: Turn off the Burleigh amplifiers, the amplifiers for cart movement, and the cable pullers. Turn off the power for the surge protector (black box, bottom left of VME rack). Turn off the VME, top of the left rack\\ 
 Go inside the lab with booties: With the dim lights on, put the tiptilt cover back on the tiptilt camera. Turn off the silver box, then black box for NIRO and replace the NIRO camera cover if used. Turn off the key for the green alignment laser and turn the power switch off. Turn off Pico 3 controller above the tiptilt camera. Turn off the blue amplifiers for the metrology laser (button is labeled "line") * Turn off the key for the metrology laser and place it on top of the laser box. Shut off lights when exiting the lab building. Return your booties to the basket if good or to the trash if they have holes in them. Make sure all doors are closed as you leave. Go inside the lab with booties: With the dim lights on, put the tiptilt cover back on the tiptilt camera. Turn off the silver box, then black box for NIRO and replace the NIRO camera cover if used. Turn off the key for the green alignment laser and turn the power switch off. Turn off Pico 3 controller above the tiptilt camera. Turn off the blue amplifiers for the metrology laser (button is labeled "line") * Turn off the key for the metrology laser and place it on top of the laser box. Shut off lights when exiting the lab building. Return your booties to the basket if good or to the trash if they have holes in them. Make sure all doors are closed as you leave.
  
chara/operating_procedures.txt · Last modified: 2023/09/01 02:50 by gail_stargazer