chara:operating_procedures [2021/08/10 13:52]
farringt0n
chara:operating_procedures [2021/08/10 20:13]
farringt0n
Line 40: Line 40:
 \\ \\
 CHARA Array Operating Procedures\\ CHARA Array Operating Procedures\\
-Copyright © 2005-2020 The CHARA Team\\ +Copyright © 2005-2021 The CHARA Team\\ 
-Last updated: 2020-1-22\\+Last updated: 2021-08-10\\
 \\ \\
 \\ \\
Line 79: Line 79:
 === Preparations in the Lab Prior to Observing === === Preparations in the Lab Prior to Observing ===
  
-27 AUG 2012 by Judit, Current version 17 JAN 2020 by Norm+27 AUG 2012 by Judit, Current version 10 Aug 2021 by Chris
  
 These are routine tasks to be performed in and around the lab every evening to prepare the array for regular observations. Note that there is a new Daily Alignment Check Procedure for configurations that do not change night to night. Use it instead of the full alignment given here. These are routine tasks to be performed in and around the lab every evening to prepare the array for regular observations. Note that there is a new Daily Alignment Check Procedure for configurations that do not change night to night. Use it instead of the full alignment given here.
Line 139: Line 139:
 If using CLASSIC or CLIMB, turn on the black box above the NIRO computer, and then turn on the silver box below it on the same cart. Remove cover on camera. After lab is completely setup, you need to take off tiptilt cover if using lab tiptilt, but do so with only the dim lights on and the laser shutter closed so as not to blast CCD with light. If using CLASSIC or CLIMB, turn on the black box above the NIRO computer, and then turn on the silver box below it on the same cart. Remove cover on camera. After lab is completely setup, you need to take off tiptilt cover if using lab tiptilt, but do so with only the dim lights on and the laser shutter closed so as not to blast CCD with light.
  
-2.6 Starting up OPLE and Metrology+2.6 Starting up OPLE and Metrology (Added 08/10/21 - Chris)
  
 \\ \\
Line 344: Line 344:
 If using Classic or CLIMB, check to make sure the dither is off by looking at the dither status in the CLASSIC/CLIMB server. If necessary, this can be turned off from the dither tab on the Classic/CLIMB GUI. They are off when gray. Shut off [METSCOPE], [NIRO CPU], and [CLS-DITH], or [CLM-DITH] if used on the POWER gui. Close the OPLE, Tiptilt, CLIMB/CLASSIC GUIs Close the Tiptilt, and CLIMB/CLASSIC servers, type CTRL+C, then Y, Visually check all telescopes in the spycams to make sure all covers and slits are closed. Turn the TV OFF. Leave GPS, Metrol, and Vacmon servers and the Telescope servers open and running If using Classic or CLIMB, check to make sure the dither is off by looking at the dither status in the CLASSIC/CLIMB server. If necessary, this can be turned off from the dither tab on the Classic/CLIMB GUI. They are off when gray. Shut off [METSCOPE], [NIRO CPU], and [CLS-DITH], or [CLM-DITH] if used on the POWER gui. Close the OPLE, Tiptilt, CLIMB/CLASSIC GUIs Close the Tiptilt, and CLIMB/CLASSIC servers, type CTRL+C, then Y, Visually check all telescopes in the spycams to make sure all covers and slits are closed. Turn the TV OFF. Leave GPS, Metrol, and Vacmon servers and the Telescope servers open and running
  
-Shut down the ople control system:+Shut down the ople control system (Added 08/10/2021 - Chris)
  
 Close the OPLE server. Close the OPLE server.