chara:operating_procedures

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
chara:operating_procedures [2021/12/21 08:09]
charaobs
chara:operating_procedures [2022/01/10 17:12]
charaobs
Line 70: Line 70:
 1.2 The Metrology Laser 1.2 The Metrology Laser
  
-A high-powered infrared laser is used for the delay line metrology. This is an eye hazard, so before entering the lab check to make sure the red light above the door is not on. If the laser is activated, it is a must to put on IR-protective goggles. If you are not sure, wear the goggles.+A high-powered infrared laser is used for the delay line metrology. This is an eye hazard, so before entering the lab check to make sure the red light above the door is not on. If the laser is activated, it is a must to put on IR-protective goggles. If you are not sure, wear the goggles. Please note that the METLAS gui or OPLE controller gui may not show the corect state of the laser.  Hit reopen on the METLAS gui if it does not agree with the others.
  
 1.3 General Lab Rules 1.3 General Lab Rules
Line 91: Line 91:
 2.1 Starting the vacuum pump for the light pipes 2.1 Starting the vacuum pump for the light pipes
  
-Go into vacuum pump shack. Flip on power switch for pump and wait for the blower to go on in about 6 seconds. Open the valve slowly (parallel to pipe means open) Note if fan cords are plugged into wall outlet to keep pumps cool in the summer.  Note oil temperature when you start up. Oil temps below 15º C make for a labored start. There is currently a block heater on the north side of the pump and a space heater on the south side. Inform Larry or Craig if the oil temp is low and the heaters did not run to bring the temp up before starting.\\ +Go into vacuum pump shack. Flip on power switch for pump and wait for the blower to go on in about 6 seconds. Open the valve slowly (parallel to pipe means open) Note if fan cords are plugged into wall outlet to keep pumps cool in the summer. Note oil temperature when you start up. Oil temps below 15º C make for a labored start. There is currently a block heater on the north side of the pump and a space heater on the south side. Inform Larry or Craig if the oil temp is low and the heaters did not run to bring the temp up before starting.\\ 
-Go into lab building, check pressures on Vacmon display. If pressure is higher than 100 torr in any of the lines, pump those lines only one at a time. Open valve a little, then come back to open fully. When all lines to be used are well below 100 torr, open all those valves. The final pressure should be 0.5 - 1.0 Torr in each line. The pump will normally bring all 6 lines down to .2-.3 Torr. The S1 and S2 lines leak the most during the day and will read the highest in the afternoon when you return, usually between 20-30 Torr in the summer and 15-25 Torr in the winter. Note any unusual vacuum readings as they can indicate a leak beyond what is normal. Sometimes a line isn't pumped down the night before and can read higher than 30 Torr. Pump the highest ones down first as stated above.+Go into lab building, check pressures on Vacmon display. If pressure is higher than 100 torr in any of the lines, pump those lines only one at a time. Open valve a little, then come back to open fully. When all lines to be used are well below 100 torr, open all those valves. The final pressure should be 0.5 - 1.0 Torr in each line. The pump will normally bring all 6 lines down to .2-.3 Torr. The S1 and S2 lines leak the most during the day and will read the highest in the afternoon when you return, usually between 20-30 Torr in the summer and 15-25 Torr in the winter. Note any unusual vacuum readings as they can indicate a leak beyond what is normal. Sometimes a line isn't pumped down the night before and can read higher than 30 Torr. Pump down the highest ones first as stated above.
  
 2.2 Filling NIRO with LN2\\ 2.2 Filling NIRO with LN2\\
 Fill both chambers on the NIRO camera. Use the gloves and glasses provided on the shelf with the funnels and the thermos. It will normally take 1 liter of LN2 in the outer chamber and 1/2 liter in the inner chamber. Fill it until the LN2 bubbles out of the top. This camera is normally kept cool all the time, exceptions will be noted.\\ Fill both chambers on the NIRO camera. Use the gloves and glasses provided on the shelf with the funnels and the thermos. It will normally take 1 liter of LN2 in the outer chamber and 1/2 liter in the inner chamber. Fill it until the LN2 bubbles out of the top. This camera is normally kept cool all the time, exceptions will be noted.\\
 \\ \\
-Record that you filled the camera in the log book, noting time and camera filled. Note also the vacuum measurement for the MIRCX camera. If you do not observe due to weather, fire or closure, make sure someone on the mountain will fill it for you.+Record that you filled the camera in the log book, noting time and camera filled. Note also the vacuum measurement for the MIRCX camera. If you do not observe due to weather, fire or closure, inform someone on the mountain before 2:30 pm so they can fill it for you.
  
 2.3 Alignment of the light path to the telescopes\\ 2.3 Alignment of the light path to the telescopes\\
Line 137: Line 137:
 The IR mirrors on the beam samplers can be adjusted using Pico 2 controller to targets depending on which IR beam combiner is to be used.\\ The IR mirrors on the beam samplers can be adjusted using Pico 2 controller to targets depending on which IR beam combiner is to be used.\\
 \\ \\
-For CLIMB 1 and CLIMB 2, the removable 6-beam target should be placed in the clamps on the CLIMB table. This also applies to aligning CLIMB for fringe tracking for VEGA or fringe finding for PAVO.\\+For CLIMB 1CLIMB 2 or CLASSIC, the removable 6-beam target should be placed in the clamps on the CLIMB table. This also applies to aligning CLIMB for fringe finding for PAVO.\\
 \\ \\
-For MIRCX, the same target should be placed in the clamps on the MIRCX table. Place the target to the appropriate table, making sure it seats firmly in the clamps. Place the small corner cubes (labeled) on their bases at the BRTs. Make sure they seat firmly and correctly. Open IR shutters, send laser light using VISBEAMS gui to the position you want to check. Use a tablet to bring up Pico 2 gui. Click on icon or in xterm type: xpico2. Select the appropriate IR mirror for the beam you are about to adjust. For ex: S1IR. The Beam Sampler gui tells you which telescope is in the beam you are aligning. When done for all telescope to be used, remove target and place it above the CLASSIC/CLIMB table and remove corner cubes from their stands and place them to the side of the beam path. Remove the labao camera covers after you remove the corner cubes from their bases.+For MIRCX, the same target should be placed in the clamps on the MIRCX table. Place the target to the appropriate table, making sure it seats firmly in the clamps. Place the small corner cubes (labeled) on their bases at the BRTs. Make sure they seat firmly and correctly. Open IR shutters, send laser light using VISBEAMS gui to the position you want to check. Use a tablet to bring up Pico 2 gui. Click on icon in the menu or in xterm type: xpico2. Select the appropriate IR mirror for the beam you are about to adjust. For ex: S1IR. The Beam Sampler gui tells you which telescope is in the beam you are aligning. When done for all telescope to be used, remove target and place it above the CLASSIC/CLIMB table and remove corner cubes from their stands and place them to the side of the beam path. Remove the labao camera covers after you remove the corner cubes from their bases.
  
 2.5 Final steps in the lab 2.5 Final steps in the lab
Line 146: Line 146:
  
 On the Metrology table inside the lab, turn on two blue amplifiers for metrology laser (on button is labeled "line") The units will hum when on. Turn the key to ON on the laser power box to put metrology laser on standby. On the Metrology table inside the lab, turn on two blue amplifiers for metrology laser (on button is labeled "line") The units will hum when on. Turn the key to ON on the laser power box to put metrology laser on standby.
 +
 +Be sure to inform the MIRCX/MYSTIC PI that you are done in the lab and that it is ok to start any alignments or STS recording that is desired. All further steps will be outside the optical lab.
  
 2.6 Starting up the new OPLE system and Metrology (Added 08/10/21 - Chris) 2.6 Starting up the new OPLE system and Metrology (Added 08/10/21 - Chris)
  
-Finish what you are doing in the lab, go out to the computer area, turn the laser signal on, and go back to the control room to complete alignment for 30 minutes while the laser warms up.+Go out to the computer area, turn the metrology laser on, and go back to the control room to complete alignment for 30 minutes while the laser warms up.
  
 After the laser is warmed up, check sockman for old OPLE"X" servers (where X is 1-6) and remove any that may be on the sockman list. After the laser is warmed up, check sockman for old OPLE"X" servers (where X is 1-6) and remove any that may be on the sockman list.
Line 155: Line 157:
 If the OPLE System Control gui is not already running on wazoo, you can start the gui in the lab with the following command If the OPLE System Control gui is not already running on wazoo, you can start the gui in the lab with the following command
  
-ssh -Y ople /opt/bin/OPLERemCtrlApp     or from the menu system, called OPLESystem.+ssh -Y ople /opt/bin/OPLERemCtrlApp or from the menu system, called OPLESystem.
  
 The gui that appears does much of the start up sequence remotely and does not fully start everything yet. This will eventually only require fewer steps to complete. The gui that appears does much of the start up sequence remotely and does not fully start everything yet. This will eventually only require fewer steps to complete.
Line 170: Line 172:
  
 Once all 6 are solid yellow, right click on each yellow dot, and select start. This loads the control software and will turn the button green. Once all 6 are green, you need to close the gui and reopen it in the control room. Once all 6 are solid yellow, right click on each yellow dot, and select start. This loads the control software and will turn the button green. Once all 6 are green, you need to close the gui and reopen it in the control room.
- 
-Be sure to inform the MIRCX/MYSTIC PI that you are done in the lab and that it is ok to start any alignments or STS recording that is desired. 
  
 \\ \\
chara/operating_procedures.txt · Last modified: 2023/09/01 02:50 by gail_stargazer