This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
chara:power_recovery [2021/08/24 13:10] gail_stargazer |
chara:power_recovery [2024/10/24 18:52] (current) gail_stargazer |
||
---|---|---|---|
Line 17: | Line 17: | ||
* All pops were out and PERI positions lost → All 6 PERI axes had to be homed and AFTER THAT set pop5 first with POPPERIGTK and adjusted M10 as needed. | * All pops were out and PERI positions lost → All 6 PERI axes had to be homed and AFTER THAT set pop5 first with POPPERIGTK and adjusted M10 as needed. | ||
- | Additional Notes After Power Outage on August, 17, 2021 | + | Additional Notes After Power Outage on August, 17, 2021, June 2022, Feb 2024. |
- | * Reinitialize the NIRO Filter Wheel. Open the niro_filter_gtk and click REINIT. Check to see if the indicator wheel on the NIRO camera is pointing to the correct filter after it is homed. Do not turn the wheel by hand. If it points to the wrong filter, home the filter wheel, and compare counts for each filter (or look for metrology light in J-band) to confirm the correct filters are in position. Then loosen the screw on the indicator wheel and align so that it points to the correct filter label. | + | * Reinitialize the NIRO Filter Wheel. Open the niro_filter_gtk and click REINIT. Check to see if the indicator wheel on the NIRO camera is pointing to the correct filter after it is homed. Do not turn the wheel by hand. If it points to the wrong filter, home the filter wheel again, and compare counts for each filter (or look for metrology light in J-band) to confirm the correct filters are in position. Then loosen the screw on the indicator wheel and align so that it points to the correct filter label that is currently in. |
* Leave plenty of time to do a full check of the alignment on all beams. | * Leave plenty of time to do a full check of the alignment on all beams. | ||
* Check alignment of MIRC-X and MYSTIC using STS. Make sure the fiber stages and internal delays are consistent with the positions recorded in the manual/ | * Check alignment of MIRC-X and MYSTIC using STS. Make sure the fiber stages and internal delays are consistent with the positions recorded in the manual/ | ||
* Home the engineering beam using BC1. A list of engineering beam positions for each beam is on a post-it note near the stage. Note that CLIMB_B1 and CLIMB_B2 are usually not homed and just left in their last good positions. If they are homed, the fringe positions for the CLIMB1 stages: CL1= 7.0565 mm and CL2 = 5.3224 mm. For the CLIMB2 stages: CL4= 2.9630 mm and CL5= 7.8500 mm. (See email from Judit on Aug 8, 2021.) | * Home the engineering beam using BC1. A list of engineering beam positions for each beam is on a post-it note near the stage. Note that CLIMB_B1 and CLIMB_B2 are usually not homed and just left in their last good positions. If they are homed, the fringe positions for the CLIMB1 stages: CL1= 7.0565 mm and CL2 = 5.3224 mm. For the CLIMB2 stages: CL4= 2.9630 mm and CL5= 7.8500 mm. (See email from Judit on Aug 8, 2021.) | ||
- | * Home and re-align lab tiptilt zaber stages. See the link herefor | + | * Home and re-align lab tiptilt zaber stages. See the {{: |
+ | * Check the PAVO ENG GUI to see if the PAVO zaber stages lost position. If so, prior to the next run, follow instructions in the {{: | ||
+ | * Restart network connection on spica-console: | ||
+ | * The Intel I219 network interface is not natively supported by Linux (something about shipping with an invalid checksum which Windows drivers ignore, but Linux takes to heart). Nils downloaded the driver source code which ignores the checksum problem and placed it at / | ||
+ | * You should be able to access it with the following command sequence (the observe account should have sudo access): | ||
+ | * To find out the version: \\ sudo ls /root | ||
+ | * enter that directory: \\ sudo cd / | ||
+ | * remove the old module (if it is still loaded): \\ sudo rmmod e1000e | ||
+ | * build the new driver: \\ sudo make install | ||
+ | * load the new module: \\ sudo modprobe e1000e | ||
+ | * ensure the module is persistent across a reboot: \\ sudo dpkg-reconfigure linux-image-$(uname -r) | ||
+ | * The STST chiller will power back on after an outage, but the cooler does not start automatically. Press the settings button to start the cooling again. | ||
+ | |||
+ | <font inherit/ | ||
+ | |||
+ | <font inherit/ | ||
+ | |||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | * <font inherit/ | ||
+ | |||
+ | <font inherit/ | ||
+ | |||
+ | Notes added Sept 20, 2024: | ||
+ | |||
+ | * Check the Exhibit Hall Displays. If the slides are not displaying correctly, log on and reboot each computer: | ||
+ | * ssh -X pi@ehpi01 | ||
+ | * Enter wifi password | ||
+ | * sudo reboot | ||
+ | * The ehpi's go from 01 to 10. | ||
+ | * You can reboot all 10 of the displays in the exhibit hall using the following command sequence: | ||
+ | * Log onto the control network (any machine) as user " | ||
+ | * Issue the command: " | ||
+ | |||
+ | Facitilities Checks: | ||
+ | |||
+ | * The HVAC unit in the pump house looses its memory during a power outage. Power cycle the HVAC unit to reconnect with the thermostat. | ||