This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
ao:labao_alignment [2018/07/06 13:37] 127.0.0.1 external edit |
ao:labao_alignment [2018/07/07 09:25] jones |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
\\ | \\ | ||
===== Periodic Alignment of LABAO and BRT 2015_12_08 (TtB) ===== | ===== Periodic Alignment of LABAO and BRT 2015_12_08 (TtB) ===== | ||
\\ This is the proceedure we used to check the alignment of the S2 LABAO-BRT system today.\\ \\ 1. Ensure that the green laser is well aligned coming out of the visible table and hitting both the target on the IR table and the target at the north end of the lab. This is most important, and if something seems odd, recheck this alignment.\\ \\ 2. Use the " | \\ This is the proceedure we used to check the alignment of the S2 LABAO-BRT system today.\\ \\ 1. Ensure that the green laser is well aligned coming out of the visible table and hitting both the target on the IR table and the target at the north end of the lab. This is most important, and if something seems odd, recheck this alignment.\\ \\ 2. Use the " | ||
- | ===== Notes from tests of LABAO and TWFS alignment 2015-12-07: | + | ===== Notes from tests of LABAO and TWFS alignment 2015-12-07 |
+ | {{ao:LABAO_Alignment_Notes_2015_12_07.pdf|LABAO Alignment notes 2015-12-07 (TtB)}} | ||
\\ | \\ | ||
===== Initial Alignment of LWFS - Mike Ireland, 7 Dec 2015 ===== | ===== Initial Alignment of LWFS - Mike Ireland, 7 Dec 2015 ===== | ||
Line 17: | Line 18: | ||
- Install the now complete SM1L10 lens tube on the front of the original SM1L10 lens tube. | - Install the now complete SM1L10 lens tube on the front of the original SM1L10 lens tube. | ||
- Install the assembly in the SM1 clamp. Determine the amount of rotation needed, and rotate the lenslet array appropriately. | - Install the assembly in the SM1 clamp. Determine the amount of rotation needed, and rotate the lenslet array appropriately. | ||
- | {{/ | + | {{ao:IMG_3530.jpg|IMG_3530.jpg}}\\ |
===== Initial Alignment of LABAO and BRT, Mike Ireland, 8 Dec 2015 ===== | ===== Initial Alignment of LABAO and BRT, Mike Ireland, 8 Dec 2015 ===== | ||
\\ This is the proceedure to align the LABAO system. It is assumed that all optics are already placed in their correct locations according to Zemax/other telescopes (Judit to write this procedure? | \\ This is the proceedure to align the LABAO system. It is assumed that all optics are already placed in their correct locations according to Zemax/other telescopes (Judit to write this procedure? |