User Tools

Site Tools


chara:new_operating_procedures

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
chara:new_operating_procedures [2024/04/17 07:26]
bflores [Snow and cold weather]
chara:new_operating_procedures [2024/04/22 20:31]
charaobs [New Operating Procedures]
Line 1: Line 1:
 ====== New Operating Procedures ====== ====== New Operating Procedures ======
  
-Last updated 04/17/2024+Last updated 04/22/2024
  
 [[:chara:operating_procedures|Link for Old Operating Procedures Page]] [[:chara:operating_procedures|Link for Old Operating Procedures Page]]
Line 168: Line 168:
   - Go to lab building   - Go to lab building
       - check pressures on Vacmon display       - check pressures on Vacmon display
-        - To open gui: Chara blue menu, **Vacuum Monitor**+        - To open gui: Chara blue menu, **Vacuum Monitor, [Status]**
       - S1 and S2 lines leak the most, so open first until they reach the level of the next highest pressure line (usually E1, then W2). Can open all the valves once they are low enough ( ~3 torr or so).       - S1 and S2 lines leak the most, so open first until they reach the level of the next highest pressure line (usually E1, then W2). Can open all the valves once they are low enough ( ~3 torr or so).
       - If pressure is higher than 100 torr in any of the lines, pump those lines only one at a time.       - If pressure is higher than 100 torr in any of the lines, pump those lines only one at a time.
 +
  
 ==== Turn on Electronics Inside the Lab ==== ==== Turn on Electronics Inside the Lab ====
chara/new_operating_procedures.txt · Last modified: 2024/05/15 06:00 by bflores